How to Install Spectis Balusters and Handrail System
IMPORTANT: Be sure to mark the center point of each newel post's location prior to installation to insure proper spacing. All product interfaces must use PL Premium Adhesive (read directions before use) for warrantee purposes and ensure lasting installation.
Spectis makes no guarantee as to the suitability of our rail systems, or any other product we sell, on any specific project or application. Before any balustrade, or any other product, is ordered and installed, Spectis recommends checking with local building code authorities to ensure relevant building code requirements are met. Most building codes dictate that the balustrade must be installed in accordance with the "4 inch ball rule". Further, most building codes specify top railing height be no lower than 36" on decks lower than 3' from grade, and 42" where the railing is to act as a guard rail. Usually, where the railing is to be purely decorative, there are no limitations.
All Spectis' railing systems are designed for termination at newel posts, walls, or some other load-supporting member. They cannot be joined to each other. Any installation where a railing section not installed as recommended will void Spectis' warranty.
The following steps outline the procedure for installing Spectis' balustrade system. It may be necessary to modify this procedure for circumstances relevant to an individual installation.
|
|
|
|
|
|
|
|
|
|
|
|
|
Recent Posts
-
Elevating Construction Excellence: The Advantages of Spectis Urethane Building Materials
Elevating Construction Excellence: The Advantages of Spectis Urethane Building MaterialsIntroduction …May 6th 2024 -
How to Install Spectis Gingerbread Gable Trim
Installation of Gable Gingerbread Trim with a center Drop.Typical installation: Gable Decoratio …Dec 10th 2018 -
How to Install Open and Closed Spectis Louver Vents on Gable
Spectis offers many styles of shutters louvers, and wall panels. All of these elements are designed …Dec 6th 2018